PROGRAM RATES
FIRST POINT POWER
OCTOBER 2024 – OCTOBER 2026
(TERM BEGINS AND ENDS ON THE DAYS OF THE MONTH THAT YOUR METER IS READ IN YOUR SEVICE AREA.)
OPTIONAL BASIC |
$0.14279 / kWh |
|
Meets MA Req |
Rate includes (1) Consultant Fee of $0.001 per kWh to facilitate the Program and (2) Operational Adder of $0.001 per kWh to fund personnel costs associated with City’s Sustainability Coordinator position.
If you are already participating in the Program but would like to switch to a different rate/product. Please process an OPT-IN form.
At the end of each term a new rate and term will be determined. It may or may not be with the same supplier. With each subsequent supplier/rate/term change, all consumers who were previously in the Program will remain in the Program.
Rate may increase as a result of a change in law that results in a direct, material increase in costs during the term of the contract.